TOG9040

Telecontrol Centre for TETRA Telemetry

TOG9040 software enables you to receive telemetry data via the TETRA or MOTOTRBO radio network from ATS telemetry unit (e.g. TMP102 as well as from connected Phoenix modules).

Description

There are almost limitless requirements and applications to transport telemetry data over an RF system. TETRA radio systems are especially suited to transport these telemetry data. TOG9040 software enables you to receive telemetry data via the TETRA radio network from ATS module TMP102 as well as from connected Phoenix modules. The software can manage digital, analogue and metering values. Telecontrol commands allow you to set digital outputs/analogue values at connected TMP102 and Phoenix modules. TOG9040 manages all telemetry objects in a master data management. Behind telemetry notifications alarm scenarios can be programmed using various alarm paths.

The programmed telemetry units will be displayed with their incoming and outgoing contacts in a tree structure. Icons in the tree structure will indicate the status of the inputs and outputs Each incoming contact can be programmed with one or multiple automatic alarm scenarios. Alarms can be set for alarm groups. The alarm services SDS, Callout, SNMP, e-mail, OPC and SMS are available.

Additional Resources

Supported Languages

• TOG9040 manages all telemetry objects in a master data management.

• Programmable. Dependent on telemetry notifications alarm scenarios can be programmed using various alarm paths. The programmed telemetry units will be displayed with their incoming and outgoing contacts in a tree structure. Icons in the tree structure will indicate the status of the inputs and outputs.

• Automatic Alarms. Each incoming contact can be programmed with one or multiple automatic alarm scenarios. Alarms can be set for alarm groups. The alarm services SDS, Callout, SNMP, e-mail, OPC and SMS are available.

• The software can manage digital, analogue and metering values.

• Telecontrol commands allow to set digital outputs/ analogue values at TMP102 and connected Phoenix modules.

• Received data messages can be forwarded via SDS, CallOut, GSM/SMS, SNMP, OPC, in preparation SMTP, MARKETS Modbus, IEC60870.

Requires one or more radio networks such as Dimetra or MOTOTRBO, a pool of one or more ATS TETRA or MOTOTRBO telemetry units e.g. TMP102, standard Windows PC platform and depending on the alarm scenario: email-, telephone-, IP-, OPC- infrastructure and -access.